As one of the main choices for modern football fields, artificial turf requires a series of strict steps and procedures in its construction process. The following is the construction process of artificial turf for football fields:
1. Planning and preparation stage
① Determine the construction scope and plan: Determine the size and shape of the football field and formulate a construction plan.
② Site cleaning: Remove the original turf, gravel and weeds, and clean the site to ensure smoothness.
2. Basic preparation
① Ground leveling: Use bulldozers and graders to level the surface of the site and ensure that the drainage system is well designed.
② Basic fill: Lay a layer of compacted gravel or gravel on the surface of the site to provide solid foundation support.
3. Artificial turf laying
① Bottom installation: Lay a layer of waterproof and breathable membrane to prevent moisture from penetrating into the bottom layer.
② Artificial turf laying: Lay the artificial turf on the base layer to ensure the smoothness and tight connection of the turf.
③ Seam treatment: Treat the seams of the turf to ensure that the seams are firmly connected.
4. Lawn fixation
① Fix the edge of the turf: Use manual or mechanical means to fix the edge of the turf to ensure that the turf will not move or deform.
② Filling: Spread filler, such as rubber particles or sand, evenly on the turf surface to increase the stability and elasticity of the turf.
5. Final acceptance
① Inspection and testing: Final inspection and testing of the completed artificial turf to ensure compliance with relevant standards and requirements.
② Acceptance and delivery: After passing the acceptance inspection, the construction of the artificial turf of the football field will be completed and delivered for use.
During the entire construction process, the construction quality needs to be strictly controlled to ensure the smoothness, stability and durability of the artificial turf. At the same time, the construction progress should be reasonably arranged and various construction procedures should be coordinated to ensure the smooth progress and high-quality completion of the construction.